PE Solitary Wall Corrugated Pipe Manufacturing Line
one.CZPT corrugated pipe (PE, PP,PVC,PA) commonly employed in the wire connection of equipment device equipment and electric box handle cabinet, the item is beautiful, light-weight and sturdy, broadly utilised in automotive wire harness, digital, mechanical wire harness and other fields.
two.The corrugated pipe extrusion line involves a vacuum feeder and a drying hopper, a SJ65 one-screw extruder, a die, forming modules, a forming equipment and a winder.
2.Features:
1. Touch monitor handle, straightforward to run
2.4-32mm without having equipment, catheter adapter
3.Stepper move, belt traction, high speed and balance
4. Affordable
NO. | Identify | CZPT |
1 | CZPT Feeder | one |
two | SJ45/30 single screw extruder with vehicle vacuum loader | 1 |
3 | Die head | 8 |
four | modules | 8 |
5 | Corrugater with mold | two |
six | Cutter | 1 |
7 | Winder with meter counting device | 1 |
Specification of HDPE Corrugated Pipe CZPT
Specification of the SJsixty five/33 Extruder
Functionality functions:
CZPT: Massive output & L/D ratio. with reduced temperature plastication principle.
Barrel: barrel is made of unique metal alloy, and is equipped with aluminum thermal foil with air cooling system.
Gearbox: gears are created of metal alloy with heat treatment method and are finished with surface precision grinding. By making use of oil injection cooling method, it reduces sounds when functioning beneath substantial RPM and improves the daily life span of gears.
Inventer:ABB Temperature table:Omron Contactor:Simens
Product | GSJ-sixty five/33 |
Extrude central top | 1100mm |
Substantial performance screw | |
Diameter | 65mm |
L/D | 33:one |
Materials | 38CrMoAlA |
Area Remedy | Nitrided and Polished |
Barrel | |
Material | 38CrMoAlA |
Interior Floor therapy | Nitrided, floor |
Heating strategy | By ceramic |
Heating handle zones | zones |
Heating energy | KW |
CZPT program | By blower fan |
CZPT zones | 4zones |
CZPT electrical power | .2KW/zone |
Gearbox | |
Material of the property | QT200 |
Gear sort | Helical gears |
Materials of the gear | 20CrMnTi |
Heat therapy of the equipment surface | Quenching |
Content of the axes bearings | 40Cr CZPTed large top quality bearing |
Main Motor | 22KW |
2.Mold die with modules
-
- mildew CZPT:Interior Dia : 1.5″ 2 “
2.2Heater Die undertake casting aluminum heater, mica heater for mouth die.
two.3Calibration Unit :The substance of sizing device is higher-high quality wearing resistance copper
two.four CZPT block: AL
two.5 All the molds inner runner are chrome plated and good mould steel.
two.6 content:40Cr and nitrided
2.7 modules:50 pairs
three. Corrugated style forming machine one set
three.1Structure Horizontal
3.2Corrugators up/down transferring motor two.2KW
3.3Xihu (West Lake) Dis. keep track of The materials is 40Cr
three.4Block seat Materials is 40Cr, nitrided
three.5Back/CZPT Observe
three.6CZPT program Oil pump: 1.1KW
3.7Corrugators motor AC motor 2.2KW x 1 set
three.8Corrugators equipment box Helical gears
3.9Corrugators cooling Block is cooled by air, .25KW x5set cooling supporter
4. haul off device and shrink pipe equipment one established
five. Cutter
3.CZPT photographs:
You just notify me what equipment you want,let us do the rest function:
one. Layout and manufacture suitble device for you.
2. Just before delivery, we will check the equipment till you are completely pleased. (You can occur to our manufacturing facility to examine the running generation line.)
three. Supply.
4. We will offer right after-income services:
(one) Field installation and commissioning
(2) Field coaching your workers (three) Area servicing and mend services
(four) Free Spare Components
(five) Video clip/On the web technological help.
Testimonials by clients
Cooperation Brand names
FAQ:
one.Are you maker or investing firm?
We are manufacturer.
two.Why pick us?
We have twenty many years experience for producing device.We can prepare for you to go to our local customer’s manufacturing unit.
3.Supply time: twenty~thirty days.
4.Payment conditions:
thirty% of overall volume should be paid by T/T as down payment, the equilibrium (70% of total amount) should be paid just before supply by T/T or irrevocable L/C(at sight).
five.Warranty: 1 year.
Truly feel cost-free contact us at any time and most welcome to check out our manufacturing facility!